Government has justified the conduction of a feasibility study on the proposed construction of a hydro-power project at Uhuru Park which is adjacent to Murchison Falls. Energy Minister Irene Muloni says cabinet resolved on Monday that Bonang Energy and Power Limited should with the study on whether or not to construct the dam. The Minister for Tourism Ephraim Kamuntu said the project will only proceed if findings show that the tourist attraction will not be affected. They spoke at the Media